Submission by Water New Zealand to Consultation: Amending Acceptable Solutions and Verification Methods 2016

Although primarily focused on ‘building’ development, in the absence of any national legal document that covers the general requirements of infrastructure construction, people start gradually relying of the provisions of the building code for compliance. Storm water lines in building sites are also still required to comply with Building Code.

Submissions

160829 Submission MBIE Verification Methods 2016 - WEBSITE.pdf

pdf
148 KB
31 Aug 2017